ARS handles the permit application and coordinates required inspections for your Richmond reroof. We manage the permit paperwork and explain any owner signature, property access or approval needed from you.
Every pin is a job we’ve done here. Click a job to find it on the map.
Roof replacements
Recent jobs in Richmond
Click a job to find it on the map
No jobs match these filters.
Dates show the milestone on file for each job, like the invoice or the utility’s approval to operate. Older jobs may list products we no longer install.
Before the work starts
Rules for Richmond
Permits
We handle your Richmond roofing permit application and coordinate required City reviews and inspections. You won’t need to manage the permit application or City paperwork yourself. A September 2026 reroof permit invoice assessed $565.27; this is a historical assessment, not proof of payment or a current quote. ARS allows approximately one week for permitting; issuance is not guaranteed.
Solar removal and reinstallation
Solar removal and reinstallation requires a separate solar permit as well as the reroof permit. We coordinate with the appropriately qualified solar contractor: an unchanged system can use its original approved drawings, while a changed layout needs the appropriate updated plans.
Deck, installation and final
We coordinate the deck-nailing, in-progress and final checks assigned to the reroof. The deck check is not limited to jobs with new plywood; we confirm exposure requirements before covering.
From the Richmond building department and our own project records. Rules updated October 15, 2026; permit-fee references reviewed October 11, 2026; detailed inspection guidance checked October 10, 2026. Fees change, so we confirm yours when we pull the permit.
Inspections
Inspections and booking
Deck and sheathing — We arrange Richmond’s 109 Roof Deck Nail inspection before concealing decking and fasteners. This reroof stage is not limited to new sheathing; we follow the inspection instructions on your permit.
In-progress — We arrange 124 InProgress and confirm with Richmond how much roofing may be installed before that visit. We keep the required work visible until approved.
Final closeout — Required reroof stage: 120 Building Final. We obtain any applicable outside-agency sign-offs on the permit card before scheduling.
Scheduling — We use iMS, call 510-447-1156 or text 866-535-4016 with one day’s advance notice. Windows are 8 a.m.–noon or noon–4 p.m., without narrower slots. We confirm actual availability.
Official references
Inspections checked October 10, 2026; public prose and permit-cost source mapping reviewed October 11, 2026. Fee components retain their stated effective dates; historical examples are not current quotes. See individual official references for applicability.