ARS handles the permit application and coordinates required inspections for your Pleasanton reroof. We manage the permit paperwork and explain any owner signature, property access or approval needed from you.
Every pin is a job we’ve done here. Click a job to find it on the map.
Roof replacements
Roof repairs
Solar by GoSimpleSolar
Recent jobs in Pleasanton
Click a job to find it on the map
No jobs match these filters.
Dates show the milestone on file for each job, like the invoice or the utility’s approval to operate. Older jobs may list products we no longer install.
Before the work starts
Rules for Pleasanton
Permits
We handle your Pleasanton roofing permit application and coordinate required City reviews and inspections. You won’t need to manage the permit application or City paperwork yourself. Pleasanton’s January 2026 fee schedule lists a $295 base for a one- or two-family dwelling reroof, including the garage. Applicable technology, energy-compliance and state charges are additional; we obtain the assessed total for your project. ARS allows approximately one week for permitting; issuance is not guaranteed.
Approval before underlayment
Required framing and sheathing inspections must pass before any weather-protection covering, including underlayment, is installed. We schedule that inspection and keep the work exposed until approval.
Recycling target
A project covered by Pleasanton’s construction-waste program must achieve 75% overall diversion. We confirm coverage, arrange the roofing debris handling, and manage Green Halo reporting and disposal tickets.
From the Pleasanton building department and our own project records. Rules updated October 15, 2026; permit-fee references reviewed October 11, 2026; detailed inspection guidance checked October 10, 2026. Fees change, so we confirm yours when we pull the permit.
Inspections
Inspections and booking
Deck and sheathing — Roof framing and sheathing must be inspected before any weather-protection covering, including underlayment, or roofing material is installed (PMC 20.04.350). The January 2026 City inspection card lists 602 Roof Sheathing for reroofs. We confirm the permit-assigned sequence before starting.
In-progress — We follow the in-progress checks assigned to your Pleasanton permit. The January 2026 inspection card uses 602 Roof Sheathing and does not list the older 603 Reroof In Progress code. We obtain every required pre-cover approval before moving ahead.
Final closeout — Final inspection, code 999, after permitted work is complete. We keep the permit/job card and required compliance documents available; we resolve applicable permit conditions before requesting inspection.
Scheduling — For next-business-day inspection, we request by 3 p.m. the prior business day through ACA, text SCHEDULE to 844-670-9753, or IVR 925-931-5322. We call 925-931-5300 from 7:30–8 a.m. for the day's window.
Official references
Inspections checked October 10, 2026; public prose and permit-cost source mapping reviewed October 11, 2026. Fee components retain their stated effective dates; historical examples are not current quotes. See individual official references for applicability.