ARS handles the permit application and coordinates required inspections for your Vallejo reroof. We manage the permit paperwork and explain any owner signature, property access or approval needed from you.
Every pin is a job we’ve done here. Click a job to find it on the map.
Roof replacements
Roof repairs
Recent jobs in Vallejo
Click a job to find it on the map
No jobs match these filters.
Dates show the milestone on file for each job, like the invoice or the utility’s approval to operate. Older jobs may list products we no longer install.
Before the work starts
Rules for Vallejo
Permits
We handle your Vallejo roofing permit application and coordinate required City reviews and inspections. You won’t need to manage the permit application or City paperwork yourself. August 2026 composition reroof permits were $276–$277. Fees changed September 14, 2026, so we obtain a current assessment. ARS allows approximately one week for permitting; issuance is not guaranteed.
Inspection while roofing is open
We book the in-progress check when 25–75% of the covering is installed and confirm any separate deck or repair hold before covering. If the in-progress check is missed, the inspector can require 100 square feet to be reopened.
Waste-plan triggers
Projects valued at least $50,000 or affecting at least 1,000 square feet need Vallejo’s construction-waste plan. We check both thresholds and arrange the plan before permit issuance, including for a reroof below $50,000 that meets the area threshold.
Recycling before final
Covered projects must divert 65% of nonhazardous waste and 75% of concrete and asphalt. We retain and submit weight tickets for approval before final and specify construction-and-demolition recycling when ordering a Recology box.
From the Vallejo building department and our own project records. Rules updated October 15, 2026; permit-fee references reviewed October 11, 2026; detailed inspection guidance checked October 10, 2026. Fees change, so we confirm yours when we pull the permit.
Inspections
Inspections and booking
Deck and sheathing — Vallejo’s usual reroof sequence is in-progress, then final. Roof Deck Nail, code 403, and separate structural approvals may also apply to deck or sheathing changes; we confirm those checks before covering.
In-progress — Required. We schedule when roof coverage is 25–75%, before completing the roof. Missing this inspection can require a reinspection, fees, an installation/warranty letter, manufacturer instructions and removal of at least 100 sq ft of roofing if verification is needed.
Final closeout — Required after reroof completion and required prior approvals. For covered C&D projects, weight-tag review must be approved before final. We keep approved permit documents, reroof form and manufacturer instructions onsite; bulletin requests CF1R-ALT-05-E and CF2R-ENV-04-E when a cool roof is required.
Scheduling — We book through eTRAKiT or IVR 707-648-4384. City recommends at least 3 business days ahead; next-day service is not guaranteed. Online requests are due by 3 p.m. the preceding day. Assigned window is AM 8–noon or PM noon–4; preferences are not guaranteed.
Official references
Inspections checked October 10, 2026; public prose and permit-cost source mapping reviewed October 11, 2026. Fee components retain their stated effective dates; historical examples are not current quotes. See individual official references for applicability.