ARS handles the permit application and coordinates required inspections for your Oakland reroof. We manage the permit paperwork and explain any owner signature, property access or approval needed from you.
Every pin is a job we’ve done here. Click a job to find it on the map.
Roof replacements
Roof repairs
Solar by GoSimpleSolar
Recent jobs in Oakland
Click a job to find it on the map
No jobs match these filters.
Dates show the milestone on file for each job, like the invoice or the utility’s approval to operate. Older jobs may list products we no longer install.
Before the work starts
Rules for Oakland
Permits
We handle your Oakland roofing permit application and coordinate required City reviews and inspections. You won’t need to manage the permit application or City paperwork yourself. Oakland’s FY2026/27 schedule lists $268.64 for a reroof permit covering up to two inspections. That line does not establish the total for a self-certified reroof certificate. We confirm the correct route and its complete charges with Oakland before payment. ARS allows approximately one week for permitting; issuance is not guaranteed.
Reroof certificate
For a qualifying certificate project, we complete and upload signed Section 2 to the original online record within 180 days. Each structure needs its own certificate, so we include a detached garage separately when it is in the roofing scope.
Work beyond the covering
A reroof certificate alone does not authorize structural or deck changes that need separate permits. We identify those repairs and their permit requirements before relying on the certificate route or setting the permit allowance.
From the Oakland building department and our own project records. Rules updated October 15, 2026; permit-fee references reviewed October 11, 2026; detailed inspection guidance checked October 10, 2026. Fees change, so we confirm yours when we pull the permit.
Inspections
Inspections and booking
Deck and sheathing — No scheduled deck inspection under an approved Re-Roofing Certificate alone. We do not extend that exemption to extra structural/deck work: we confirm its permit classification before covering. Separately permitted construction can require roof-plywood nailing and framing inspections.
In-progress — We confirm and coordinate the applicable requirements. No City inspection is required for the approved self-certified reroof certificate scope. Any separately permitted or changed scope follows its assigned inspections and must not be concealed before required approval.
Final closeout — For the certificate route, we complete Section 2 and upload the completed certificate to its original Online Permit Center record after work. Certificate validity is 180 days; one certificate covers one structure. Separately permitted work needs its own required closeout.
Scheduling — No inspection booking for the approved certificate-only route. Other work: City inspection app, bbcode-inspect@oaklandca.gov or 510-238-3444; no same-day inspections. We request at least 2 business days ahead for a desired date.
Official references
Inspections checked October 10, 2026; public prose and permit-cost source mapping reviewed October 11, 2026. Fee components retain their stated effective dates; historical examples are not current quotes. See individual official references for applicability.